AQUA WSC – Splitcase Project August 22, 2019
Weaver Pump Station (New pumps, ground storage tank and elevated storage tank – City of Bastrop
Owner: Aqua Water Supply Corporation
Engineer-Steger & Bizzell
Contractor-Keystone Construction
Commissioned-February 8, 2019
Pumps-(3) PACO KP6015-3/4 rated for 2,900 GPM @ 188’ TDH, NSF 61 Certified, mounted on structural steel bases with Faulk DBZ Steelflex couplings with Baldor, Premium Eff., 200hp, 1780 RPM, 460/3/60, TEFC motors controlled by Yaskawa P1000 VFD’s
Pump station more than quadruples the previous capacity and added another pressure plain to the area around TX Highway 290 and FM 21 in Bastrop, Texas
Read More
City of Galveston – Waste Water
Treatment Plant August 23, 2019
Three Grundfos 27 HP 8” discharge Submersible Dry Pit Pumps were installed at the City of Galveston Airport Wastewater Treatment Plant to solve a problem with existing Dry Pit Centrifugal Pumps failing when flooding occurs in this underground vault during tropical
Read More
City of League City Booster Station
Installation and Programming August 23, 2019
Installed (2) two 60hp, 750 gpm & (2) two 125hp, 2300 gpm Split Case Pumps at League City Northside Water Booster Station. (4) Four Variable Frequency Drives were installed and programmed by our trained technicians to properly meet the demands of the water