Dynamo Stadium – Stormwater Removal

Three Grundfos “S” Series 40hp, 12” Discharge Submersible Pumps were installed for storm water protection producing 4000 gallons per minute per pump. The playing field is located below street level making these pumps critical to field operation. Project Images…

City of Galveston – Waste Water
Treatment Plant

Three Grundfos 27 HP 8” discharge Submersible Dry Pit Pumps were installed at the City of Galveston Airport Wastewater Treatment Plant to solve a problem with existing Dry Pit Centrifugal Pumps failing when flooding occurs in this underground vault during tropical…

San Jacinto River Authority

Grundfos/Peerless Vertical Turbine Pumps were installed at Lake Conroe to provide Raw Water intake to a Surface Water Treatment Plant for water distribution in Montgomery County. This project consisted of (3) 48”wide x 30’deep Pump Barrels (2) 18” Discharge Vertical…

Puerto Rico Aquaduct and Sewer Authority (PRASA)

Our experienced Service Technicians were hired by Grundfos Water Utility, to solve a critical problem with the operation of (2) two Grundfos “S” Pumps in a storm water application. After a field electrical and mechanical inspection our Technicians were able to start…

Water Well Trust Completes Two Texas Water Well Projects in Memory of Late Pumps of Houston, Inc. CEO Skip Cook

The Water Well Trust, the only national nonprofit helping Americans get access to a clean, safe water supply, has completed two water well projects in south Texas in memory of the late CEO of Pumps of Houston, Inc., E.D. “Skip” Cook. Click here for a complete write…

City of Pasadena

The project was designed to prevent flooding from blocking hurricane evacuation routes. We used Grundfos Axial-Flow Submersible Pumps. This line is capable of pumping up to 150,000 gallons per minute and features a compact design, as well as construction cost…

City of League City Booster Station
Installation and Programming

Installed (2) two 60hp, 750 gpm & (2) two 125hp, 2300 gpm Split Case Pumps at League City Northside Water Booster Station. (4) Four Variable Frequency Drives were installed and programmed by our trained technicians to properly meet the demands of the water…

City of Splendora Rehab

The pumps and panel were old and rot and needed to be replaced. They had old, shot guide cables inside their wet well which are never implemented into new lift station designs anymore. The discharge and valves were under ground and hard to access.

We quoted them a complete rehab with new panel, pumps, guide rails, discharge piping, valves etc. with our installation/service costs. We gutted everything inside the wet well and installed a new base plate at the bottom of the lift station with the pump discharge connections. We installed SS guide rail and SS 2” discharge piping. We cored holes in the top of the hatch and had discharge header coming out of top with valves above ground. The header was measured and designed at the shop before we brought it to site to be installed. 2HP Myers V series grinder pumps were put down the hole, and we installed COH NEMA 4X SS duplex control panel onto existing rack. We were able to knock all of this out in one day with swift planning.

AQUA WSC – Splitcase Project

Weaver Pump Station (New pumps, ground storage tank and elevated storage tank – City of Bastrop Owner: Aqua Water Supply Corporation Engineer-Steger & Bizzell Contractor-Keystone Construction Commissioned-February 8, 2019 Pumps-(3) PACO KP6015-3/4 rated for 2,900 GPM @ 188’ TDH, NSF 61 Certified, mounted on structural steel bases with Faulk DBZ Steelflex couplings with Baldor, Premium Eff., 200hp, 1780 RPM, 460/3/60, TEFC motors controlled by Yaskawa P1000 VFD’s

Pump station more than quadruples the previous capacity and added another pressure plain to the area around TX Highway 290 and FM 21 in Bastrop, Texas

Houston Methodist Hospital

This was a very special project, Flygt was originally spec’d in this project but they ended up passing on it as well as other pump companies here in Houston. What was very special about this project was at first the flow rate, 1200GPM @13.3’tdh only a Chicago-Yeoman pump with an RPM of 875 could meet that low total dynamic head. This project was completed with a Triplex set up using a 9 ft. x 23 ft. Fiberglass basin. While we supplied the lift station it was AECOM Hunt who installed the lift station using overnight crane services.

Telge Jarvis

This was our first Grundfos Engineered skid package we ever sold, (4) vertical split case pumps pumping each 833gpm@162’tdh to create 2500gpm mounted, piped and installed on a huge base with a special control panel. I attached our quote we received from the factory this will have all the info you need to upload on the website some drawings as well.